Download our app:

Road works

Phase 2: working towards the Netherlands from the end of May

As of the end of May 2019, the second phase of the motorway in the direction of the Netherlands will be renewed. These works will take about two months. The traffic temporarily drove over two narrow lanes in both directions, on the other side of the motorway.

Stay informed

Together with the contractor, we will do our utmost to reduce the inconvenience during these works as much as possible.
You will always find all available information about this project on www.wegenenverkeer.be/heusden-zolder.

Road works